< Back to Previous Construction
Photos (122) from Aug 2011 to
Oct 2011 |
|
>>>
click on pics for enlargement (one at a time) <<< |
| | 124 | |
|
 |
 |
 |
|
Adding a perimeter reflecting pond at BR#2 patio
3047 |
South facade of Living Room
at Study / Mezzanine
3048 |
South facade of Living Room
at Study / Mezzanine
3049 |
|
 |
 |
 |
|
Water piping being installed
in Eqpt Rm #2
3050 |
A BBQ area on roof over
Living Room being formed
3051 |
Another view of BBQ area
on roof over Living Room
being formed
3052 |
|
 |
 |
 |
|
a View toward Living Room /
Sun Room from Upper Roof
Deck over BR #2
3053 |
A herd of A/C condensing
units (CU's) coralled
over Studio
3054 |
Looking due SouthEast
at covered entry framing
for glass canopy
3055 |
|
 |
 |
 |
|
looking past skylights over
Studio toward A/C CU's
3056 |
A magnificent view up
and West along South
face of Sun Room
3057 |
a close-up view of curtain
wall above Mezzanine
3058 |
|
 |
 |
 |
|
not easy to get a broad
view of the structure
from within the trees
3059 |
Jungle? Rainforest?
Vivarium?
3060 |
Biosphere? Ecosystem?
Oakwood?
3061 |
|
>>>
click on pics for enlargement (one at a time) <<< |
|
 |
 |
 |
|
looking toward BR#2 / Study
canopy. The flying buttress
is obscured by palm tree.
3062 |
East door to MBR and South curtain wall with
sloped glazed ceiling
3063 |
Canopy at BR#2 and Study
3064 |
|
 |
 |
 |
|
view from outside South
corner of BR#2 toward
Study / Mezzanine / Sun Room
3065 |
view at steps from MBR
and South curtain wall
glass from BR#2
3066 |
looking North ti canopy at
Study with massive
curtain wall above
3067 |
|
 |
 |
 |
|
Project Foreman Virgil
laying in some reinforcing
steel for BBQ slab
3068 |
door frame installed
at Kiln Room
3069 |
Door frame installed at
Laundry Room looking
through to Master Bath
3070 |
|
Biosphere?
Ecosystem? |
 |
 |
|
view under Canopy C at
main entrance looking
toward driveway beyond
3071 |
A smiling plumbing
contractor ready to make connection to water main.
3072 |
water main connection at dirveway entrance
3073 |
|
 |
 |
 |
|
Water main shut-off valve and formwork for cover slab
3074 |
water main cover slab poured
3075 |
water main cover slab poured with access lid installed
3076 |
|
 |
 |
 |
|
more formwork for perimeter reflecting pond at BR#2 patio
3077 |
Plumbing, Mechanical and Electrical elements being installed in bath room
3078 |
BBQ formwork taking shape
3079 |
|
 |
 |
 |
|
Steel base plate for
"The Tower" over Eqpt
Rm #2 with conduit
for electrical
3080 |
a view from up on high
roof looking way down to
patio at BR#2
(camera ht approx 35')
3081 |
trench for water supply
to residence. Main driveway gate in distance.
3082 |
|
>>>
click on pics for enlargement (one at a time) <<< |
|
|
|
|
|
>>>
click on pics for enlargement (one at a time) <<< |
|
|
|
|
|
back to top |
|
|
|
|
| Construction Photos continued > |