| | 110 | |
|
 |
 |
 |
|
March 9, 2010 |
pouring footings for
the "floating column"
|
pouring footings
at West Patio |
|
 |
 |
 |
|
March 10, 2010 |
pouring footings
at West Patio |
pouring footings
at West Patio |
|
 |
 |
 |
|
March 23, 2010 |
Cistern Reservoir - looking South |
preparing slab and footings
at Cistern |
|
 |
 |
 |
|
March 24, 2010 |
Cistern Reservoir - looking South
|
preparing slab
at Cistern |
|
 |
 |
 |
|
March 28, 2010 |
slab at Cistern - looking North
|
slab at Cistern - looking South |
|
 |
 |
 |
|
March 31, 2010 |
Cistern east wall - looking North
|
Structural Engineer
Manuel Garcia, PE
with Peter inspecting
progress at Cistern |
|
 |
 |
|
|
April 02, 2010 |
Cistern South end with Reservoir
looking North
|
Cistern "floating column"
being formed |
|
 |
 |
 |
|
April 09, 2010
Cistern - looking ESE |
Tom Krips Construction crew
working hard
|
Cistern - looking NNW |
|
 |
 |
 |
|
April 12, 2010 |
Cistern
lookin ENE
|
West wall(s) of house
coming out of ground
next to Cistern |
|  |
 |
 |
| April 20, 2010 Pre-Construction view(s) of
the Accessory Building |
|  |  |  |
| April 20, 2010 Pre-Construction view(s) of
the Accessory Building |
|
 |
 |
 |
|
April 22, 2010
Cistern looking South
with first waterproofing coat |
Footings taking shape |
a-maze-ing!!! |
|
 |
 |
 |
|
April 27, 2010
(no... it's not an archaelogical dig!... it just looks like one) |
a lot of footings |
preliminary stucco work on Cistern |
|
 |
 |
 |
|
April 30, 2010
Final stucco coat on Cistern |
Cistern protected from rain with
6mil poly for a period of two weeks
for curing |
Footing steel being installed |
|
 |
 |
 |
|
May 07, 2010 |
looking like an archaeological dig? |
|
|
 |
 |
 |
|
May 10, 2010 |
footing formwork |
pouring foundations |
|
 |
 |
 |
|
May 12, 2010 |
|
foundations poured with beautiful
Live Oaks in background |
|
 |
 |
 |
|
May 15, 2010 |
trenching for new footings |
column steel rising |
|
 |
 |
 |
|
May 18, 2010 |
stem walls are up |
Cistern (covered) in background |
|
 |
 |
 |
|
June 04, 2010
Graded for slab pour |
Swinging to the right (west) |
Tarp removed over Cistern |
|
 |
 |
 |
|
June 04, 2010
More footings |
Digging ... ooops...making the
foundation pad larger |
Cistern overflow-drain
over which reflecting ponds
will eventually cantilever |
|
 |
 |
 |
|
June 05, 2010 |
lotsa steel |
starting columns |
|
 |
 |
 |
|
June 07, 2010 |
pouring footings
|
|
|
 |
 |
 |
|
June 07, 2010 |
we had our own little "oil spill",
it was concrete "mud" and we sure hope that doesn't happen again |
|
|
 |
 |
 |
|
June 09, 2010
the crew taking a brief moment to pose for a photo, and then right back to it... |
|
footings after forming
is removed |
|
 |
 |
 |
|
June 10, 2010
the start of the forming for the cantilevered reflecting ponds
(looking south) |
the formwork for the reflecting
ponds over the Cistern
(looking southeast) |
the south end of the Cistern
the column in the center will eventually support
Reflecting Pond #2 |
|
 |
 |
 |
|
June 14, 2010
|
|
Bob Perry, PLS, Surveyor and
assistant Donnie laying out corners |
|
 |
 |
 |
|
June 14, 2010
Forming cantilevered reflecting pond |
|
 |
 |
 |
|
June 16, 2010 |
looking NE toward Entry Foyer |
Can you spot the 10" block?
Yes... there is 10" concrete block. |
|
 |
 |
 |
|
June 17, 2010
Preparing for plumbing penetrations for reflecting ponds |
Plumbing for reflecting ponds
being installed |
another view of plumbing for reflecting ponds (looking SE) |
|
 |
 |
 |
|
June 19, 2010 |
Peter and Project Superintendant
Virgil West looking over plans |
|
|
 |
 |
 |
|
June 21, 2010 |
Plumbing for Reflecting Pond |
|
|
 |
 |
 |
|
June 21, 2010 |
Reflecting Pond steel |
|
|
 |
 |
 |
|
June 30, 2010 |
Looking North toward front entry foyer and base for large glass wall |
Looking South toward Sun Room pump room |
|
|
|
|
|
|
|
keep an eye here as photos are updated weekly |
|