The Oakwood Residence
A Nature Sanctuary
Miami, FL
                       
Thao's Pagoda

Oakwood Project Index
Click on the item below
            item description
  1 Oakwood Project Information Site Info, Building Info, Consultants and Contractors
10 Oakwood Project Description  Project Description & Owner's Statement
  20 Oakwood Illustrations Floor Plans / Elevations / Misc
50 Oakwood Photo Station Map Photo Station Map

51 Oakwood Photo Station #01 Photo Station #01

52 Oakwood Photo Station #02 Photo Station #02

53 Oakwood Photo Station #03 Photo Station #03

54 Oakwood Photo Station #04 Photo Station #04

55 Oakwood Photo Station #05 Photo Station #05

56 Oakwood Photo Station #06 Photo Station #06

57 Oakwood Photo Station #07 Photo Station #07
58 Oakwood Photo Station #08 Photo Station #08

59 Oakwood Photo Station #09 Photo Station #09
60 Oakwood Photo Station #10 Photo Station #10

61 Oakwood Photo Station #11 Photo Station #11
100 Oakwood Demolition Photos January 2010

110 Oakwood Construction Photos February 2010 to June 2010
112 Oakwood Construction Photos July 2010 to December 2010
114 Oakwood Construction Photos January 2010 to March 2010
116 Oakwood Construction Photos April 2011 to June 2011
118 Oakwood Construction Photos June 2011 to August 2011
120 Oakwood Construction Photos August 2011 to October 2011
122 Oakwood Construction Photos October 2011 to December 2011
124 Oakwood Construction Photos December  2011 to December 2011

126Oakwood Construction PhotosJanuary 2012 to February 2012

128 Oakwood Construction Photos February 2012 to February 2012

130Oakwood Construction PhotosFebruary 2012 to April 2012
132Oakwood Construction PhotosApril 2012 to June 2012
134Oakwood Construction PhotosJuly 2012 to August 2012
136Oakwood Construction PhotosAugust 2012 to October 2012
138Oakwood Construction PhotosOctober 2012 to November 2012
140Oakwood Construction PhotosNovember 2012 to December 2012
142Oakwood Construction PhotosDecember 2012 to January 2013
144Oakwood Construction PhotosJanuary 2013 to February 2013
146Oakwood Construction PhotosFebruary 2013
148Oakwood Construction PhotosMarch 2013 to September 2013

150Oakwood Construction PhotosOctober 2013

152Oakwood Construction PhotosOctober 2013 to December 2013

154Oakwood Construction PhotosDecember 2013 to March 2014
801 Topping Off Day June 14, 2011
901 Oakwood Miscellaneous Photos Miscellaneous Photos

904 Quan Yin Statue Photos Quan Yin Statue Photos

907 Chilin (Kirin) Statue Photos Chilin (Kirin) Statue Photos

908Gongshi PhotosGongshi Photos

Construction Photos  (continued)  
< Back to Previous Construction Photos (130)
from March 2012 to April 2012
 >>>   click on pics for enlargement (one at a time)   <<<
132
Temporary scaffolding
for "The Tower"
being constructed
3182
looking up and easterly
to Living Room and
Sun Room  ceiling framing
at 28 ft above main floor
3183
Project Foreman Virgil
taking measurements
on "The Tower"
temporary scaffolding
3184



looking Southwest toward the temporary scaffolding
for The Tower
3185
hmmmm?  
low flying airplanes may have to watch out for the tower when it arises.  We may have to apply for a red warning beacon.
3186
The Scholar Rock
(aka Gongshi)
arrives by flatbed weighing
in at approx 12 tons.
3187


The Scholar Rock
(aka Gongshi)
 >>> also please  
see this LINK <<<

3188
Many views of "The Tower"
will be through the many
Live Oaks but ultimately it
will rise just above
the Live Oak canopy
3189
The welder doing some
grinding on the tower
frame as it is pre-assembled
on the roof deck
3190

one of the inner sleeves
for the Solatube skylights
about to be installed
3191
inner sleeve
for Solatube skylight
being installed

3192
the Solatube sleeve
installed with protective film in place.. the final surface is amazingly reflective.
3193

more grinding of tower frame
3194
Peter (orange hat) inspecting progress on The Tower.  
No detail goes
unnoticed by Peter...
...seriously!!!
3195
a steep view of The Tower
from way down below.  
From ground level The Tower tops out at approx
59 ft above grade
3196
a view from the Mezzanine looking down and northerly toward the main entry Foyer
and the Breakfast Nook
3197
tube steel collonade along
south wall of Studio
3198
looking up toward Mezzanine. The column to right of glass block will have a curtain wall dividing Living Room / Mezz and Sun Room and a glass observation deck.
3199
view from Living Room West
end toward West Patio,
Reflecting Pond #1
and Waterfall
3200
Entry Foyer giving a hint of
the amazing quality of light through the adjacent glass
block wall.  Can't wait till the wall and fllor surfaces are finished.
3201
Tower steel element being manually hoisted into place.
3202


Virgil, precariously balancing himself in position to locate frame member in place.
We hope the safety officer was not watching but we think there
is a safety harness
unseen from this angle
3203
Tower frame base being installed on its parapet
wall base
3204
Yes, those tube steel members are heavy.
3205
The Tower frame starts
to take shape...
...and Yes, we've already
heard most  "giant cheese grater" jokes.
3206
a good sense of perspective
of The Tower and how it
soars through the Live Oaks
to the sky
3207
What is and what isn't?  
Hard to tell?
The Tower IS in there somehwere.
3208

a view toward the Master Bath and Master Vanity with Reflecting Pond #2
3209
If one looks closely one can
see some of The Tower
though the trees
3210
Workers on lift installing the
G-P "Densglass" (yellow) sheathing around
Sun Room skylights
3211


Skylight in Sun Room have yellow "Densglass" sheathing and the ones over Living Room have classic "drywall"
gypsum board
3212
up on the roof deck, a
Solatube skylight dome
(21" dia)
3213
Workman applying sealant
to skylight base prior to roof surface installation
3214

lookin East-North-East
toward the flying buttress...
...and its not just for show!
3215
a view of south side of 
"The Tower"
with scaffolding removed
3216
a view of west side of 
"The Tower"
with scaffolding removed

3217

a view of north side of 
"The Tower"
with scaffolding removed

3218
upper section of
The Tower frame
3219
lower section of  The
Tower frame

3220


a closer view of east side
of "The Tower"
with scaffolding removed

3221
The Tower as it rises above
the tree canopy
3222
a structural steel support tube
to support the cabinetry for
the Master Vanity
3223


a workmans ladder leading
up to the Mezzanine
3224
roof over Master Bedroom
and Master Vanity
3225
roof over west end
of Living Room
3226

three vertical fixed glass windows on North
wall of Upper Loft
3227
Air Hander Unit (AHU)
being installed
lower section
3228
Air Hander Unit (AHU)
being installed
upper section

3229
Solatube dome
3230
through this slot and over a horizontal glass panel will flow all the water that drains from nearly the entire roof surface onto Reflecting Pond #1 at West end of Living Room
3231
small Scholar Rock
now resting on site waiting
to be located within
the Sun Room
3232
metal framing being installed for circular door passage between Living Room (R)
and Sun Room (L)
3233
Circular door being
tested in position
3234
Circular door now in place
3235

view of circular door
from Sun Room
3236
a sense of the scale
of the circular door
(top of metal framing at 7-1/2 ft)
in relation to Sun Room glass block wall (top at 28 ft)
3237
looking up to tower with temporary scaffold planks
3238

looking up to tower with temporary scaffold planks
3239
base of tower with access hatch down to Equipment room below
3240
 >>>   click on pics for enlargement (one at a time)   <<<
keep an eye here as photos are updated weekly
back to top