| Temporary scaffolding for "The Tower" being constructed
3182 | looking up and easterly to Living Room and Sun Room ceiling framing at 28 ft above main floor
3183 | Project Foreman Virgil taking measurements on "The Tower" temporary scaffolding
3184
|
|
 |  |
 |
| looking Southwest toward the temporary scaffolding for The Tower
3185 | hmmmm? low flying airplanes may have to watch out for the tower when it arises. We may have to apply for a red warning beacon.
3186 | The Scholar Rock (aka Gongshi) arrives by flatbed weighing in at approx 12 tons.
3187 |
|
 |  |
 |
| The Scholar Rock (aka Gongshi) >>> also please see this LINK <<<
3188 | Many views of "The Tower" will be through the many Live Oaks but ultimately it will rise just above the Live Oak canopy
3189 | The welder doing some grinding on the tower frame as it is pre-assembled on the roof deck
3190 |
|  |  |
 |
| one of the inner sleeves for the Solatube skylights about to be installed
3191 | inner sleeve for Solatube skylight being installed
3192 | the Solatube sleeve installed with protective film in place.. the final surface is amazingly reflective.
3193 |
|
 |  |  |
| more grinding of tower frame
3194 | Peter (orange hat) inspecting progress on The Tower. No detail goes unnoticed by Peter... ...seriously!!!
3195 | a steep view of The Tower from way down below. From ground level The Tower tops out at approx 59 ft above grade
3196 |
|  |  |  |
| a view from the Mezzanine looking down and northerly toward the main entry Foyer and the Breakfast Nook
3197 | tube steel collonade along south wall of Studio
3198 | looking
up toward Mezzanine. The column to right of glass block will have a
curtain wall dividing Living Room / Mezz and Sun Room and a glass
observation deck.
3199 |
|  |  |  |
| view from Living Room West end toward West Patio, Reflecting Pond #1 and Waterfall
3200 | Entry
Foyer giving a hint of the amazing quality of light through the
adjacent glass block wall. Can't wait till the wall and fllor
surfaces are finished.
3201 | Tower steel element being manually hoisted into place.
3202 |
|  |
 |
 |
| Virgil, precariously balancing himself in position to locate frame member in place. We hope the safety officer was not watching but we think there is a safety harness unseen from this angle
3203 | Tower frame base being installed on its parapet wall base
3204 | Yes, those tube steel members are heavy.
3205 |
|  |  |  |
| The Tower frame starts to take shape... ...and Yes, we've already heard most "giant cheese grater" jokes.
3206 | a good sense of perspective of The Tower and how it soars through the Live Oaks to the sky
3207 | What is and what isn't? Hard to tell? The Tower IS in there somehwere.
3208 |
|
 |  |  |
| a view toward the Master Bath and Master Vanity with Reflecting Pond #2
3209 | If one looks closely one can see some of The Tower though the trees
3210 | Workers on lift installing the G-P "Densglass" (yellow) sheathing around Sun Room skylights
3211 |
|  |
 |
 |
| Skylight in Sun Room have yellow "Densglass" sheathing and the ones over Living Room have classic "drywall" gypsum board
3212 | up on the roof deck, a Solatube skylight dome (21" dia)
3213 | Workman applying sealant to skylight base prior to roof surface installation
3214 |
|
 |  |  |
| lookin East-North-East toward the flying buttress... ...and its not just for show! 3215 | a view of south side of "The Tower" with scaffolding removed
3216 | a view of west side of "The Tower" with scaffolding removed
3217 |
|  |  |
 |
| a view of north side of "The Tower" with scaffolding removed
3218 | upper section of The Tower frame
3219 | lower section of The Tower frame
3220 |
|
 |  |
 |
| a closer view of east side of "The Tower" with scaffolding removed
3221 | The Tower as it rises above the tree canopy
3222 | a structural steel support tube to support the cabinetry for the Master Vanity
3223 |
|  |
 |
 |
| a workmans ladder leading up to the Mezzanine
3224 | roof over Master Bedroom and Master Vanity
3225 | roof over west end of Living Room
3226 |
|
 |  |  |
| three vertical fixed glass windows on North wall of Upper Loft
3227 | Air Hander Unit (AHU) being installed lower section
3228 | Air Hander Unit (AHU) being installed upper section
3229 |
|  |  |  |
| Solatube dome
3230 | through
this slot and over a horizontal glass panel will flow all the water
that drains from nearly the entire roof surface onto Reflecting Pond #1
at West end of Living Room
3231 | small Scholar Rock now resting on site waiting to be located within the Sun Room
3232 |
|  |  |  |
| metal framing being installed for circular door passage between Living Room (R) and Sun Room (L)
3233 | Circular door being tested in position
3234 | Circular door now in place
3235 |
|  |  |
 |
| view of circular door from Sun Room
3236 | a sense of the scale of the circular door (top of metal framing at 7-1/2 ft) in relation to Sun Room glass block wall (top at 28 ft)
3237 | looking up to tower with temporary scaffold planks
3238 |
|  |
 | |
| looking up to tower with temporary scaffold planks
3239 | base of tower with access hatch down to Equipment room below
3240 |
|
| | | |
|
>>>