|
|
|
|
|
< Back to Previous Construction Photos (132)
from April 2012 to June 2012 |
|
>>>
click on pics for enlargement (one at a time) <<< |
| | 134 | |
|
 |
 |  |
| temporary location of plinth while building under construction
3241 | plinth with statue base
3242 | A very happy Thao with Buddha statue
3243
|
|  |  |  |
| roof membrane being applied around skylights
3244 | workers applying adhesive for roof membrane
3245 | roof membrane being rolled out
3246 |
|  |
 |
 |
| roof membrane around skylights
3247 | roof membrane at curb edge
3248 | a lot of equipment and tools necessary to apply roofing materials
3249 |
|
 |  |
 |
| adhesive being carefully applied around skylights
3250 | leveling compound being applied along a transtional area of roof surface
3251 | Live Oak branches hovering over newly applied roof membrane
3252 |
|  |  |  |
| roof membrane just before being applied to parapet
3253 | roof membrane being applied to parapet
3254 | roof membrane after being applied to parapet
3255 |
|  |  |  |
| roof membrane around skylight near Roof Top A/C Unit (RTU)
3256 | some creative use of electrical and plumbing conduit and piping
3257 | roof membrane seam heater / roller... or at least thats what we think it is...
3258 |
|  |
 |
 |
| painters working on the tower which disappears up into the trees
3259 | roof membrane over Master Bath
3260 | roof membrane over Master BR
3261 |
|
 |  |  |
| finished roof membrane... and yes those spots are Live Oak leaves ... and endless supply
3262 | looking Southeast from West Patio toward door to west end of Living Room
3263 | The Tower, now painted white soaring up to the sky... the view is spectacular and hard to put into words
3264 |
|  |  |  |
| another view from below of The Tower (with temporary ladder)
3265 | the top of The Tower is approximately 60' above the ground floor and then add two feet above grade....
3266 | looking up to the observation platform which will eventually have a metal grating floor / access hatch
3267 |
|  |  |  |
| painting crew (wearing proper safety harness) working on The Tower
3268 | looking down over Studio... the square elements are skylights
3269 | roof membrane being applied near roof top A/C compressor stands 3270 |
|
 |  |
 |
| roof membrane near West Patio and showing just how close the house was built to the underside of Live Oak trunk/branch. Every effort was made to protect the trees... and ... The "Lorax" is reported to have been spotted on the property from time to time.
3271 | a view looking South from over the Media Room indicating the Live Oak branches and in middle right one can see the roll-down door purposely hidden behind a parapet wall
3272 | another view of the Live Oak branches and their proximity to the building. When you see or meet Peter ask him about this and maybe take "the Oakwood Tour" 3273 |
| | | |
| | | stay tuned... more to come.... |
|
>>>
click on pics for enlargement (one at a time) <<< |
|
|
|
keep an eye here as
photos are updated weekly |
|
|
|
|
|
back to top |
| | | |
|
Construction Photos continued > |