< Back to Previous Construction Photos (126)
from January 2012 to February 2012 |
|
>>>
click on pics for enlargement (one at a time) <<< |
| | 128 | |
|
 |
 |
 |
|
Our man Peter working the JLG Lift to bring one of the roll-down doors to the installation crew
3122 |
Lowering the roll-down door onto a waiting carriage prior to installation
3123 |
An interesting perspective view of the glass block clerestory above the living room. One can see a kitchen exhaust upblast fan in lower left
3124 |
|
 |
 |  |
| Looking toward the north exterior wall of the Upper Loft, One can see the three (3) openings for fixed glass windows .
3125 | A view looking down over the Studio and the ever-present Live Oak trees.
3126 | Almost three of the five columns of prefabricated glass block panels are installed. Top at 28'-0" above finished floor 0'-0"
3127 |
|  |
 |
 |
| Looking SouthEast through Conserviary / Sun Room
3128 | Looking way up to ceiling over Conserviary / Sun Room. One can see Hambro(tm) joists and A/C duct as well as Solatube(tm) Domed Skylights (21" diameter)
3129 | Looking South East from Bedroom #2 (with Curtain wall glazing in position)
3130 |
|
 |  |  |
| The exterior of Bedroom #2 (with Curtain wall glazing in position)
3131 | Upblast exhaust fans over Kitchen
3132 | Looking South in Conserviary / SunRoom to glass block panels (glass blocks are 8" x 8")
3133 |
|  |  |
 |
| Exterior close up of Conserviary / SunRoom glass block panels
3134 | Three full columns installed
3135 | Roll-down door mounted with adjacent motorized controller A metal cover will protect the assembly
3136 |
|  |  |
 |
| A unique perspective from the Mezzanine level roof deck looking ENE toward the Conserviary
3137 | The framed opening for the Master Vanity fixed glass window
3138 | Fixed glass window installed in the framed opening at the Master Vanity
3139 |
|  |  |  |
| Another view of the glass block panels on South wall of Conserviary
3140 | A view from Living Room toward glass block panels on South wall of Conserviary
3141 | A "foliated" view of the exterior of the Conserviary
3142 |
|
 |  |
 |
| Exhaust fan over the Master Bath Hmmm? ... Are those Live Oak leaves?
3143 | Exhaust "Upblast" Fans over Kitchen
3144 | Roll-down door over Studio Northwest wall
3145 |
|  |  |  |
| A rare view (from the JLG lift) looking toward glass block panels in Conserviary (from about 25' above ground)
3146 | The opening through which this view is taken will receive glass block panels like those seen here
3147 | The south wall of the Conserviary is now completed with 20 panels
3148 |
|  |
 |
 |
| A view along the axis where a 28 ft high curtain will divide the Conserviary (L) and the Living Room (R) This is where the glass grand staircase will rise to the Mezzanine (upper right)
3149 | The temporary crane hoist for raising and installing the 600# pound each glass block panels at the Conserviary
3150 | glass block panel crew installing counter weights for hoisting those heavy panels. Solatube(tm) domed skylights in foreground. 3151
|
|
>>>
click on pics for enlargement (one at a time) <<< |
|
|
|
|
|
|
|
|
|