Oakwood Previous Page    OAKWOOD CONSTRUCTION PHOTOGRAPHY    Oakwood Home Page

The Oakwood Residence
A Nature Sanctuary
Miami, FL
                       
Thao's Pagoda

Oakwood Project Index
Click on the item below
            item description
  1 Oakwood Project Information Site Info, Building Info, Consultants and Contractors
10 Oakwood Project Description  Project Description & Owner's Statement
  20 Oakwood Illustrations Floor Plans / Elevations / Misc
50 Oakwood Photo Station Map Photo Station Map

51 Oakwood Photo Station #01 Photo Station #01

52 Oakwood Photo Station #02 Photo Station #02

53 Oakwood Photo Station #03 Photo Station #03

54 Oakwood Photo Station #04 Photo Station #04

55 Oakwood Photo Station #05 Photo Station #05

56 Oakwood Photo Station #06 Photo Station #06

57 Oakwood Photo Station #07 Photo Station #07
58 Oakwood Photo Station #08 Photo Station #08

59 Oakwood Photo Station #09 Photo Station #09
60 Oakwood Photo Station #10 Photo Station #10

61 Oakwood Photo Station #11 Photo Station #11
100 Oakwood Demolition Photos January 2010

110 Oakwood Construction Photos February 2010 to June 2010
112 Oakwood Construction Photos July 2010 to December 2010
114 Oakwood Construction Photos January 2010 to March 2010
116 Oakwood Construction Photos April 2011 to June 2011
118 Oakwood Construction Photos June 2011 to August 2011
120 Oakwood Construction Photos August 2011 to October 2011
122 Oakwood Construction Photos October 2011 to December 2011
124 Oakwood Construction Photos December  2011 to December 2011

126Oakwood Construction PhotosJanuary 2012 to February 2012
128 Oakwood Construction Photos February 2012 to February 2012
130Oakwood Construction PhotosFebruary 2012 to March 2012
132Oakwood Construction PhotosApril 2012 to July 2012
134Oakwood Construction PhotosJuly 2012 to August 2012
136Oakwood Construction PhotosAugust 2012 to October 2012
138Oakwood Construction PhotosOctober 2012 to November 2012
140Oakwood Construction PhotosNovember 2012 to December 2012
142Oakwood Construction PhotosDecember 2012 to January 2013
144Oakwood Construction PhotosJanuary 2013 to February 2013
146Oakwood Construction PhotosFebruary 2013
148Oakwood Construction PhotosMarch 2013 to September 2013
801 Topping Off Day June 14, 2011
901 Oakwood Miscellaneous Photos Miscellaneous Photos

904 Quan Yin Statue Photos Quan Yin Statue Photos

907 Chilin (Kirin) Statue Photos Chilin (Kirin) Statue Photos

908Gongshi PhotosGongshi Photos

Construction Photos  (continued)  
< Back to Previous Construction Photos (126)
from January 2012 to February 2012
 >>>   click on pics for enlargement (one at a time)   <<<
128
Our man Peter working
the JLG Lift to bring one of
the roll-down doors to the installation crew
3122
Lowering the roll-down door
onto a waiting carriage
prior to installation
3123
An interesting
perspective view of the glass block clerestory above
the living room.
One can see a kitchen exhaust upblast fan in lower left
3124


Looking toward the north
exterior wall of the Upper Loft, One can see the
three (3) openings for
fixed glass windows .
3125
A view looking down over
the Studio and the
ever-present Live Oak trees.
3126
Almost three of the five
columns of prefabricated glass block panels are installed.
Top at 28'-0" above
finished floor 0'-0"
3127


Looking SouthEast through
Conserviary / Sun Room

3128
Looking way up to ceiling over Conserviary / Sun Room.
One can see Hambro(tm) joists and A/C duct as well as
Solatube(tm) Domed Skylights
(21" diameter)
3129
Looking South East
from Bedroom #2
(with Curtain wall
glazing in position)
3130

The exterior of Bedroom #2
(with Curtain wall
glazing in position)

3131
Upblast exhaust fans
over Kitchen
3132
Looking South in Conserviary / SunRoom to glass block panels
(glass blocks are 8" x 8")
3133

Exterior close up of
Conserviary / SunRoom
glass block panels

3134
Three full columns installed
3135
Roll-down door mounted with adjacent motorized controller
A metal cover will
protect the assembly
3136

A unique perspective from the Mezzanine level roof deck  looking ENE toward
the Conserviary
3137
The framed opening for the Master Vanity fixed
glass window
3138
Fixed glass window installed
in the framed opening
at the Master Vanity

3139
Another view of the
glass block panels on
South wall of Conserviary
3140
A view from Living Room
toward glass block panels on
South wall of Conserviary

3141
A "foliated" view of the
exterior of the Conserviary
3142


Exhaust fan over
the Master Bath
Hmmm? ...
Are those Live Oak leaves?
3143
Exhaust "Upblast" Fans
over Kitchen
3144
Roll-down door over Studio
Northwest wall
3145
A rare view (from the JLG lift)  looking toward glass block panels in Conserviary
(from about 25' above ground)
3146
The opening through which this view is taken will receive
glass block panels
like those seen here

3147
The south wall of the Conserviary is now completed with 20 panels
3148


A view along the axis 
where a 28 ft high curtain
will divide the Conserviary (L)  and the Living Room (R)
This is where the glass grand staircase will rise to  the Mezzanine (upper right)
3149
The temporary crane hoist for raising and installing the 600# pound each glass block panels
at the Conserviary
3150
glass block panel crew
installing counter weights
for hoisting those heavy panels.
Solatube(tm) domed skylights in foreground.
3151


 >>>   click on pics for enlargement (one at a time)   <<<