previousnext

                         
Media Printing

Media Printing

                           
10101011

Media Printing

This Pompano Beach printing operation suffered from high humidity, causing frequent machine breakdown. The Architectural/Engineering solution involved air conditioning and insulating over 100,000 square feet of plant area, reorganization and sealing of exterior openings, and correcting critical flow patterns.

pf_ind_home_20120424


search